EssayNICE | 24/7 Homework Help
Essaynice Will Help You Write Your Essays and Term Papers
Answered » You can buy a ready-made answer or pick a professional tutor to order an original one.
In Problem 7.1, the following additional information is known: the lost time per phase is 5 seconds, there are two lanes for N/S through and right turn traffic, one lane in each of the other traffic movements shown in Table 7.6 (the table for Problem 7.1). Each lane is 12 ft wide, and the approaching speed for E/W street is 30 ft/s while that for N/S street is 20 ft/s. The width of all the crosswalks at that intersection is 10 ft wide, and there are typically 10 pedestrians crossing either street in any one phase. (d) Using the timing value after pedestrian green time check, compute: i. The average delay per movement. ii. The average delay per phase. iii. The overall intersection delay. iv. Determine the level of service per phase and for overall intersection. Table 7.6 Data for Problem 7.1 Phase Allowed movements Analysis flow rate Saturation flow rate 1 NB L, SB L 330, 365 veh/h 1700, 1750 veh/h 2 NB T/R, SB T/R 1125, 1075 veh/h 3400, 3300 veh/h EB L, WB L 110, 80 veh/h 650, 600 veh/h 3 EB T/R, WB T/R 250, 285 veh/h 1750, 1800 veh/h
HOME TO CERTIFIED WRITERS
Why Place An Order With Us?
- Certified Editors
- 24/7 Customer Support
- Profesional Research
- Easy to Use System Interface
- Student Friendly Pricing